System integration, multi-objective optimisation, and real-world demonstration on operational power-grid infrastructure. Lead beneficiary: Estabanell Energia, S.A.U. (ANELL).
Integrate the scientific results from WP1-WP4 into an intelligent optimisation platform for real-time monitoring, management, and diagnosis of real power grids.
Lead: Estabanell Energia, S.A.U. (ANELL) · Timing: M7-M42 · Main ESR involvement: ESR12
This work package contributes primarily to RO-5 and is part of the proposal-stage programme structure captured in the SAILING Part B document.
Lead, timing, and role in the overall SAILING architecture.